Contents
Chapter # 1
Conductor Material
1 – 15
-
1.1Introduction01
-
1.2Copper07
-
1.3Aluminum10
Chapter # 2
Enclosure Material
17 – 22
-
2.1Introduction17
-
2.2Aluminum Alloy19
-
2.3Steel19
-
2.4Stainless Steel20
-
2.5Enclosure Losses21
Chapter # 3
Insulating Material
23 – 41
- 3.1Introduction23
- 3.2Porcelain27
- 3.3Glass29
- 3.4Resin30
- 3.5Polyester Films37
- 3.6Insulating Gas (SF6 and g3)38
Chapter # 4
Processes
43 – 68
- 4.1Introduction43
- 4.2Welding44
- 4.3Jointing52
- 4.4Plating57
- 4.5Painting59
- 4.6Coating62
- 4.7Galvanizing64
Chapter # 5
Impedance
69 – 100
- 5.1Introduction69
- 5.2Resistance69
- 5.3Inductance84
- 5.4Capacitance89
- 5.5Voltage Drop91
- 5.6Conductor Configuration93
- 5.7Induced Losses95
- 5.8Power Loss & Capitalization100
- 5.9Principle Of Similitude100
Chapter # 6
Ampacity
101 – 111
- 6.1Introduction101
- 6.2Conduction102
- 6.3Convection102
- 6.4Radiation104
- 6.5Solar Radiation105
- 6.6Conductor Shape106
- 6.7Rating108
Chapter # 7
Short Circuit Forces
113 – 132
- 7.1Introduction113
- 7.2Forces113
- 7.3Stresses126
- 7.4Deflection & Resonance128
- 7.5Short Circuit Current Waveform129
Chapter # 8
Isolated Phase Bus (IPB)
133 – 175
- 8.1Introduction133
- 8.2Description134
- 8.3Theory136
- 8.4Design and Sizing145
- 8.5Construction153
- 8.6Manufacture160
- 8.7Testing163
- 8.8Installation171
- 8.9Commissioning172
Chapter # 9
Non-Seg & Seg Phase Bus (Busduct)
177 – 198
- 9.1Introduction177
- 9.2Description178
- 9.3Theory183
- 9.4Design and Sizing188
- 9.5Construction191
- 9.6Manufacture192
- 9.7Testing193
- 9.8Installation196
- 9.9Commissioning197
Chapter # 10
Sandwich Bus (Busway)
199 – 212
- 10.1Introduction199
- 10.2Description200
- 10.3Design207
- 10.4Manufacture209
- 10.5Installation210
- 10.6Commissioning212
Chapter # 11
Cast Resin Bus (CRB)
213 – 223
- 11.1Introduction213
- 11.2Description214
- 11.3Design218
- 11.4Manufacture221
- 11.5Testing222
- 11.6Installation222
- 11.7Commissioning223
Chapter # 12
Solid Insulated Bus (SIB)
225 – 237
- 12.1Introduction225
- 12.2Description225
- 12.3Design231
- 12.4Manufacture232
- 12.5Testing235
- 12.6Installation236
- 12.7Commissioning237
Chapter # 13
Gas Insulated Bus (GIB)
239 – 257
- 13.1Introduction239
- 13.2Description242
- 13.3Design248
- 13.4Manufacture252
- 13.5Testing255
- 13.6Installation255
- 13.7Commissioning257
Chapter # 14
High Voltage Open Bus (HVOB)
259 – 277
- 14.1Introduction259
- 14.2Description259
- 14.3Design261
- 14.4Manufacture276
- 14.5Testing276
- 14.6Installation276
- 14.7Commissioning277
Chapter # 15
High Current Open Bus (HCOB)
279 – 288
- 15.1Introduction279
- 15.2Description279
- 15.3Design286
- 15.4Manufacture286
- 15.5Testing287
- 15.6Installation287
- 15.7Commissioning288
Chapter # 16
Cable Bus (CB)
289 – 303
- 16.1Introduction289
- 16.2Description291
- 16.3Design294
- 16.4Manufacture299
- 16.5Testing300
- 16.6Installation301
- 16.7Commissioning303
Chapter # 17
Busduct Accessories
305 – 318
- 17.1Introduction305
- 17.2Conductor Expansion Joints305
- 17.3Enclosure Expansion Joints308
- 17.4Fire Separation Walls & Fire Stops310
- 17.5Disconnecting Link313
- 17.6Sleeves & Seal Boots313
- 17.7Anti-Condensation Heater315
- 17.8Filters, Breathers & Drain Plugs316
- 17.9Tap Off Boxes317
- 17.10Support Structure317
Chapter # 18
Generator Connection Accessories
319 – 346
- 18.1Introduction319
- 18.2Generator Circuit Breakers319
- 18.3Isolating Switches326
- 18.4SPVT Cubicles327
- 18.5Neutral Grounding Cubicle332
- 18.6Excitation Transformer Cubicle336
- 18.7Earthing Transformer Cubicles337
- 18.8Current Transformers (CT)338
- 18.9Forced Air Cooling Equipment341
- 18.10Pressurization Equipment342
- 18.11Hot Air Blower (HAB)343
- 18.12Hydrogen Leak Detection344
- 18.13Hot Spot Temperature Monitoring345
- 18.14Anti-Condensation Heater System345
- 18.15Potential Discharge (PD) Monitoring346
APPENDIX
- Bibliography347
- Publications354
- Books355
- Standards356
- Symbols & Units359
- Abbreviations361
- Index363