Chapter # 1

1.1

1.2

1.3

Conductor Material …………………………………………………………………………………………………………………………….

Introduction …………………………………………………………………………………………

Copper ………………………………………………………………………………………………..

Aluminum …………………………………………………………………………………………….

1 – 15

01

07

10

Chapter # 2

2.1

2.2

2.3

2.4

2.5

Enclosure Material …………………………………………………………………………………………………………………………….

Introduction …………………………………………………………………………………………

Aluminum Alloy …………………………………………………………………………………….

Steel ……………………………………………………………………………………………………

Stainless Steel ………………………………………………………………………………………

Enclosure Losses …………………………………………………………………………………..

17 – 22

17

19

19

20

21

Chapter # 3

3.1

3.2

3.3

3.4

3.5

3.6

Insulating Material ……………………………………………………………………………………………………………………………

Introduction …………………………………………………………………………………………

Porcelain ……………………………………………………………………………………………..

Glass …………………………………………………………………………………………………..

Resin …………………………………………………………………………………………………..

Polyester Films ……………………………………………………………………………………..

Insulating Gas (SF6 and g3) …………………………………………………………………….

23 – 41

23

27

29

30

37

38

Chapter # 4

4.1

4.2

4.3

4.4

4.5

4.6

4.7

Processes …………………………………………………………………………………………………………………………………………………….

Introduction …………………………………………………………………………………………

Welding ……………………………………………………………………………………………….

Jointing ……………………………………………………………………………………………….

Plating ………………………………………………………………………………………………..

Painting ……………………………………………………………………………………………….

Coating ………………………………………………………………………………………………..

Galvanizing ………………………………………………………………………………………….

43 – 68

43

44

52

57

59

62

64

Chapter # 5

5.1

5.2

5.3

5.4

5.5

5.6

5.7

5.8

5.9

Impedance …………………………………………………………………………………………………………………………………………………..

Introduction …………………………………………………………………………………………

Resistance ……………………………………………………………………………………………

Inductance …………………………………………………………………………………………..

Capacitance ………………………………………………………………………………………….

Voltage Drop ………………………………………………………………………………………..

Conductor Configuration …………………………………………………………………………

Induced Losses ……………………………………………………………………………………..

Power Loss & Capitalization ……………………………………………………………………

Principle Of Similitude …………………………………………………………………………..

69 – 100

69

69

84

89

91

93

95

100

100

Chapter # 6

6.1

6.2

6.3

6.4

6.5

6.6

6.7

Ampacity …………………………………………………………………………………………………………………………………………………….

Introduction …………………………………………………………………………………………

Conduction ………………………………………………………………………………………….

Convection …………………………………………………………………………………………..

Radiation …………………………………………………………………………………………….

Solar Radiation …………………………………………………………………………………….

Conductor Shape ………………………………………………………………………………….

Rating ………………………………………………………………………………………………..

101 – 111

101

102

102

104

105

106

108

Chapter # 7

7.1

7.2

7.3

7.4

7.5

Short Circuit Forces ………………………………………………………………………………………………………………………….

Introduction …………………………………………………………………………………………

Forces …………………………………………………………………………………………………

Stresses……………………………………………………………………………………………….

Deflection & Resonance ………………………………………………………………………..

Short Circuit Current Waveform……………………………………………………………….

113 – 132

113

113

126

128

129

Chapter # 8

8.1

8.2

8.3

8.4

8.5

8.6

8.7

8.8

8.9

Isolated Phase Bus (IPB) ……………………………………………………………………………………………………………..

Introduction …………………………………………………………………………………………

Description ………………………………………………………………………………………….

Theory ………………………………………………………………………………………………..

Design and Sizing …………………………………………………………………………………

Construction …………………………………………………………………………………………

Manufacture …………………………………………………………………………………………

Testing ………………………………………………………………………………………………..

Installation ………………………………………………………………………………………….

Commissioning …………………………………………………………………………………….

133 – 175

133

134

136

145

153

160

163

171

172

Chapter # 9

9.1

9.2

9.3

9.4

9.5

9.6

9.7

9.8

9.9

Non-Seg & Seg Phase Bus (Busduct) …………………………………………………………………

Introduction …………………………………………………………………………………………

Description ………………………………………………………………………………………….

Theory ………………………………………………………………………………………………..

Design and Sizing …………………………………………………………………………………

Construction …………………………………………………………………………………………

Manufacture …………………………………………………………………………………………

Testing ………………………………………………………………………………………………..

Installation ………………………………………………………………………………………….

Commissioning …………………………………………………………………………………….

177 – 198

177

178

183

188

191

192

193

196

197

Chapter # 10

10.1

10.2

10.3

10.4

10.5

10.6

Sandwich Bus (Busway) …………………………………………………………………………………………………………

Introduction …………………………………………………………………………………………

Description ………………………………………………………………………………………….

Design ………………………………………………………………………………………………..

Manufacture …………………………………………………………………………………………

Installation ………………………………………………………………………………………….

Commissioning …………………………………………………………………………………….

199 – 212

199

200

207

209

210

212

Chapter # 11

11.1

11.2

11.3

11.4

11.5

11.6

11.7

Cast Resin Bus (CRB) ……………………………………………………………………………………………………………………..

Introduction …………………………………………………………………………………………

Description ………………………………………………………………………………………….

Design ………………………………………………………………………………………………..

Manufacture …………………………………………………………………………………………

Testing ………………………………………………………………………………………………..

Installation ………………………………………………………………………………………….

Commissioning …………………………………………………………………………………….

213 – 223

213

214

218

221

222

222

223

Chapter # 12

12.1

12.2

12.3

12.4

12.5

12.6

12.7

Solid Insulated Bus (SIB) …………………………………………………………………………………………………………..

Introduction …………………………………………………………………………………………

Description ………………………………………………………………………………………….

Design ………………………………………………………………………………………………..

Manufacture …………………………………………………………………………………………

Testing ………………………………………………………………………………………………..

Installation ………………………………………………………………………………………….

Commissioning …………………………………………………………………………………….

225 – 237

225

225

231

232

235

236

237

Chapter # 13

13.1

13.2

13.3

13.4

13.5

13.6

13.7

Gas Insulated Bus (GIB) ……………………………………………………………………………………………………………..

Introduction …………………………………………………………………………………………

Description ………………………………………………………………………………………….

Design ………………………………………………………………………………………………..

Manufacture …………………………………………………………………………………………

Testing ………………………………………………………………………………………………..

Installation ………………………………………………………………………………………….

Commissioning …………………………………………………………………………………….

239 – 257

239

242

248

252

255

255

257

Chapter # 14

14.1

14.2

14.3

14.4

14.5

14.6

14.7

High Voltage Open Bus (HVOB) ……………………………………………………………………………………….

Introduction …………………………………………………………………………………………

Description ………………………………………………………………………………………….

Design ………………………………………………………………………………………………..

Manufacture …………………………………………………………………………………………

Testing ………………………………………………………………………………………………..

Installation ………………………………………………………………………………………….

Commissioning …………………………………………………………………………………….

259 – 277

259

259

261

276

276

276

277

Chapter # 15

15.1

15.2

15.3

15.4

15.5

15.6

15.7

High Current Open Bus (HCOB) ……………………………………………………………………………………….

Introduction …………………………………………………………………………………………

Description ………………………………………………………………………………………….

Design ………………………………………………………………………………………………..

Manufacture …………………………………………………………………………………………

Testing ………………………………………………………………………………………………..

Installation ………………………………………………………………………………………….

Commissioning …………………………………………………………………………………….

279 – 288

279

279

286

286

287

287

288

Chapter # 16

16.1

16.2

16.3

16.4

16.5

16.6

16.7

Cable Bus (CB) ………………………………………………………………………………………………………………………………………..

Introduction …………………………………………………………………………………………

Description ………………………………………………………………………………………….

Design ………………………………………………………………………………………………..

Manufacture …………………………………………………………………………………………

Testing ………………………………………………………………………………………………..

Installation ………………………………………………………………………………………….

Commissioning …………………………………………………………………………………….

289 – 303

289

291

294

299

300

301

303

Chapter # 17

17.1

17.2

17.3

17.4

17.5

17.6

17.7

17.8

17.9

17.10

Busduct Accessories ……………………………………………………………………………………………………………………….

Introduction …………………………………………………………………………………………

Conductor Expansion Joints …………………………………………………………………….

Enclosure Expansion Joints …………………………………………………………………….

Fire Separation Walls & Fire Stops …………………………………………………………..

Disconnecting Link ………………………………………………………………………………..

Sleeves & Seal Boots …………………………………………………………………………….

Anti-Condensation Heater ………………………………………………………………………

Filters, Breathers & Drain Plugs ………………………………………………………………

Tap Off Boxes ……………………………………………………………………………………….

Support Structure ………………………………………………………………………………….

305 – 318

305

305

308

310

313

313

315

316

317

317

Chapter # 18

18.1

18.2

18.3

18.4

18.5

18.6

18.7

18.8

18.9

18.10

18.11

18.12

18.13

18.14

18.15

Generator Connection Accessories …………………………………………………………………..

Introduction …………………………………………………………………………………………

Generator Circuit Breakers ……………………………………………………………………..

Isolating Switches …………………………………………………………………………………

SPVT Cubicles ………………………………………………………………………………………

Neutral Grounding Cubicle ……………………………………………………………………..

Excitation Transformer Cubicle ………………………………………………………………..

Earthing Transformer Cubicles ………………………………………………………………..

Current Transformers (CT) ………………………………………………………………………

Forced Air Cooling Equipment ………………………………………………………………..

Pressurization Equipment ………………………………………………………………………

Hot Air Blower (HAB) …………………………………………………………………………….

Hydrogen Leak Detection ………………………………………………………………………

Hot Spot Temperature Monitoring ………………………………………………………….

Anti-Condensation Heater System ………………………………………………………….

Potential Discharge (PD) Monitoring ……………………………………………………….

319 – 346

319

319

326

327

332

336

337

338

341

342

343

344

345

345

346

APPENDIX

………………………………………………………………………………………………………………………………………………………………………………

Bibliography ……………………………………………………………………………………….

Publications ………………………………………………………………………………………..

Books ………………………………………………………………………………………………..

Standards …………………………………………………………………………………………..

Symbols & Units ………………………………………………………………………………….

Abbreviations ……………………………………………………………………………………..

Index ………………………………………………………………………………………………….

.

——— xxx ———

.

347

354

355

356

359

361

363